| 5.3104.11a
Check for presence of asbestos-containing materials (ACMs) | Potential ACMs will be handled in accordance with SWS 2.0110.2 Potential Asbestos-Containing Materials | Ensure a safe work environment |
| 5.3104.11b
Assessment | Fuel oil leaks will be detected through visual inspection of piping system Gas leaks will be detected through use of properly calibrated combustion gas detector or bubble test of piping system | Determine leak location |
| 5.3104.11c
Repair fuel leak | Nearest valves on either side of leak location will be closed Piping, fitting, or device will be repaired or replaced | Ensure fuel piping system does not leak |
| 5.3104.11d
Confirm system is leak free | Isolated section will be reconnected to fuel supply Fuel oil leaks will be detected through visual inspection of piping system Gas leaks will be detected through use of properly calibrated combustion gas detector or bubble test of piping system | Confirm system is safe for operation |
| 5.3104.11e
Clean fuel oil leak | Fuel oil leaks will be cleaned and materials will be disposed of in accordance with local codes Oily rags and paper used to clean up the spill shall be placed in an approved safety container until properly disposed Outdoor oil spills will be reported in accordance with local codes and jurisdictions | Remove hazardous materials |
| 5.3104.11f
Reinsulate area | Where insulation was removed, repaired pipe, fitting, or device will be reinsulated with new insulation to
IECC
IECC
International Energy Conservation Code
, and
ASHRAE
ASHRAE
American Society of Heating, Refrigerating and Air-Conditioning Engineers, www.ashrae.org
90.1, at a minimum | Reduce energy loss Maintain safe surface temperature |