FavoritePlease sign in to add this to your favorites. Topic: Hydronic Heating (Hot Water and Steam) Subtopic: Piping (Distribution Installation) Desired Outcome: Properly functioning radiators Multifamily HomesPrintCopy to ExcelEmail TitleSpecification(s)Objective(s) 5.3103.6a Conduct trap inventory and testing Location and type of traps will be determined and documented for future useTrap operation and condition will be determined using methods that include temperature difference between inlet/outlet, infrared camera, sound, and observation of flooded cold radiators and condensate temperature at the condensate/boiler feed tank Identify nonfunctioning traps 5.3103.6b Replace or repair traps as necessary Nearest valves on either side of steam trap location will be closedTrap bodies will be disassembled and thermostatic element replaced or new trap will be installed Replacement steam trap will be properly sized to match load requirements, not the pipe sizeReplacement steam trap will be of proper pressure ratingInstall strainers before traps on the steam mains Ensure properly functioning steam traps 5.3103.6c Education Completed work will be reviewed with the building/property management team and operations staffBuilding/property management team and operations staff will be educated on the safe and efficient operation and maintenance requirements of the installed item Ensure building/property management team and operations staff is informed of the safe, efficient operation and maintenance requirements of the installed item Previous Detail Next Detail Back to 5.3103 Piping (Distribution Installation) Back to Top