FavoritePlease sign in to add this to your favorites. Topic: Hydronic Heating (Hot Water and Steam) Subtopic: Equipment Installation Desired Outcome: Optimize boiler efficiency and prevent of short cycling Multifamily HomesPrintCopy to ExcelEmail TitleSpecification(s)Objective(s) 5.3102.4a Assessment Controls specified for replacement will be confirmedExisting controls to be retained will be confirmed as installed correctlyCurrent settings will be documented Document status of existing controls 5.3102.4b Repair Existing installation will be corrected if settings do not match specified scope of work Ensure boiler operates at optimal water temperaturesReduce short cycling 5.3102.4c Replacement of aquastat Existing controls will be removedNew control will be visible and installed in an accessible location for adjustments in accordance with manufacturer specificationsNew control will be set to temperature settings stated on scope of work Ensure boiler operates at optimal water temperaturesReduce short cycling 5.3102.4d Testing Temperature and pressure gauges will be checked for accuracyContractor will observe and confirm boiler operation over a minimum of three cyclesSafety control will be tested to ensure the burner shuts off at high limit Ensure proper installationEnsure proper and safe operation 5.3102.4e Education Property manager will be educated on the operation and purpose of controls and settings Ensure proper use of controlsMaintain optimal temperature settings Previous Detail Next Detail Back to 5.3102 Equipment Installation Back to Top