FavoritePlease sign in to add this to your favorites. Topic: Hydronic Heating (Hot Water and Steam) Subtopic: Equipment Installation Desired Outcome: Safe and optimal gas supply to all gas-fired equipment Multifamily HomesPrintCopy to ExcelEmail TitleSpecification(s)Objective(s) 5.3102.29a Assessment Existing gas piping will provide appropriate pressure and supply rate for boilers per scope of workExisting gas line will be leak freeLeaks will be repaired before proceedingAdequacy of gas service will be confirmedGas pressure booster will be removed whenever possibleIf a gas pressure booster is necessary, compatibility will be confirmed with the newly specified gas-fired equipmentLow and high gas pressure switches will be checked for proper operation Ensure safe and proper gas supply to equipment 5.3102.29b Gas valves Gas valves will be removed and replaced in accordance with manufacturer specifications Provide gas to burner when there is a call for heat Control volume of gas for burner Ensure the safe shut off of gas once heat is turned off 5.3102.29c Location Gas train will be located/installed to not create a trip hazard or be damaged by water Ensure worker safetyEnsure durability of equipment 5.3102.29d New gas piping and pressure regulators Gas pressure regulators requiring venting will be vented to the outdoors with a rigid pipeGas train components, pipe material, and pipe sizing will comply with all applicable codes or local ordinance Deliver adequate gas pressure to boiler 5.3102.29e Testing For newly installed systems, gas train will be pressure-tested for leaksFor existing systems, gas train will be tested for leaks in accordance with local utility requirementsGas pressure and supply rates will be tested to confirm they comply to specified scope of work and burner requirements Ensure safe operating conditions 5.3102.29f Education Building/property management team and operations staff will be educated on the operation of the high and low gas pressure switches, gas valve, gas pressure booster, and gas regulatorBuilding/property management team and operations staff will be educated on the indications of raw gas leaks Ensure building/property management team and operations staff and occupant safetyMaintain proper operation of gas train Previous Detail Next Detail Back to 5.3102 Equipment Installation Back to Top