| 5.3102.27a
Assessment | Existing boiler, burner, gas valve, and gas pressure booster will be capable for modulation Compatibility between specified controls and existing burner will be confirmed Remaining existing controls will be confirmed as installed correctly Current settings will be documented | Document the status of existing controls |
| 5.3102.27b
Repair | Existing installation will be corrected if settings do not match specified scope of work Appropriate repairs will be made to the following components in accordance with scope of work and manufacturer specifications: - Linkage
- Gas/oil valves
- Air damper on burner
- Combustion controls
| Ensure boiler modulates to optimize efficiency Reduce short cycling |
| 5.3102.27c
Replacement of modulation control | Existing controls will be removed All new pressure controls will be free of mercury New controls will be installed in accordance with manufacturer specifications New control will be set to temperature settings (hot water boiler) and pressure settings (steam boiler) as stated on scope of work Applicable burner linkages, nozzles, cams, oil pump pressure setting, and gas valve will be adjusted to specified burner firing range | Ensure boiler modulates to optimize efficiency Reduce short cycling |
| 5.3102.27d
Disposal of mercury-containing modulation control | Removed modulation control will be disposed of in accordance with
EPA
EPA
U.S. Environmental Protection Agency, www.epa.gov
regulation | Prevent mercury from entering the environment |
| 5.3102.27e
Upgrade/install modulation control | All new pressure controls will be free of mercury New controls will be installed in accordance with manufacturer specifications New control will be electrically connected to burner panel and supplied with power in accordance with manufacturer specifications New control will be set to temperature settings (hot water boiler) and pressure settings (steam boiler) as stated on scope of work Applicable burner linkages, nozzles, cams, oil pump pressure setting, and gas valve will be adjusted to specified burner firing range | Ensure boiler modulates to optimize efficiency Reduce short cycling |
| 5.3102.27f
Testing | For steam boiler, pressure gauges will be checked for accuracy For hot water boiler, pressure and temperature gauges will be checked for accuracy Contractor will observe and confirm boiler operation over a minimum of three cycles | Ensure proper installation Ensure proper operation |
| 5.3102.27g
Education | Property manager will be educated on the operation and purpose of controls and settings | Ensure proper use of controls Maintain optimal settings to ensure modulation occurs |