FavoritePlease sign in to add this to your favorites. Topic: Hydronic Heating (Hot Water and Steam) Subtopic: Equipment Installation Desired Outcome: Pressure relief valve properly installed Multifamily HomesPrintCopy to ExcelEmail TitleSpecification(s)Objective(s) 5.3102.20a Check for presence of asbestos-containing materials (ACMs) Potential ACMs will be handled in accordance with SWS 2.0110.2 Potential Asbestos-Containing Materials Ensure a safe work environment 5.3102.20b Assessment Available plans will be reviewed to assess system design and intent (e.g., total relief capacity in steam volume and number of valves required for code compliance) Ensure specified valve meets relief requirements of the system 5.3102.20c Install valves Pressure relief valves will be installed in accordance with manufacturer specifications and in compliance with local codes Properly install pressure relief valves 5.3102.20d Discharge tube Discharge tube will be in place, intact, and installed as sizedDischarge tube will be the same size as pressure relief valve outletDischarge tube will be properly secured to prevent damageDischarge tube termination will be in accordance with applicable codes Ensure valve discharges to a safe location 5.3102.20e Verification Visually confirm the pressure temperature valve is rated per manufacturer's recommendation or per local code Ensure valve discharges and reseats at specified pressure 5.3102.20f Education Completed work will be reviewed with the property managerProperty manager will be educated on the safe and efficient operation and maintenance requirements of the installed item Ensure building/property management team and operations staff is informed of the safe, efficient operation and maintenance requirements of the installed item Previous Detail Next Detail Back to 5.3102 Equipment Installation Back to Top