| 5.3102.18a
Flue condensate drainage | All potential condensate collection (low) points in the flue system will be identified and adjusted to provide proper pitch as required by the manufacturer's requirements All condensate piping will be pitched toward the drain (refer SWS 5.3102.2 Venting Sealed Combustion Appliance) | Remove all flue gas condensation Ensure that all potential points of condensation collection are drained |
| 5.3102.18b
Connection | Connections in condensate drain system will be watertight | Ensure condensate drain connections do not leak |
| 5.3102.18c
Pumps | When approved by the local jurisdiction, condensate drain pumps will be installed when condensate cannot be drained by gravity Power source for pump will be installed Operation and drainage of pump will be verified | Ensure condensate properly drains |
| 5.3102.18d
Vents and traps | Vents and traps will be installed on condensate drain lines Traps supplied with the equipment will be used in accordance with manufacturer specifications | Ensure condensate drain operates as designed Ensure condensate trap does not leak air |
| 5.3102.18e
Termination | Condensate drain will be terminated in accordance with local codes | Ensure condensate does not leak to the building Ensure condensate drain does not freeze |
| 5.3102.18f
Floor drains | Floor drains will be in working condition | Ensure proper drainage of the room |
| 5.3102.18g
Neutralization kit | Boiler manufacturer-specified neutralization kit will be installed between the boiler and the drain in accordance with manufacturer specifications Property manager/occupant will be educated on proper maintenance | Neutralized flue gas condensate before it is discharged into a drain Increase durability of equipment |
| 5.3102.18h
Piping material | Piping material, located between boiler and neutralization kit, will be capable of withstanding acidic environments Piping material, located after neutralization kit and before floor drain, will be hard piped to withstand crushing and kinking | Ensure longevity of the piping Protect piping |
| 5.3102.18i
Education | Completed work will be reviewed with the building/property management team and operations staff Building/property management team and operations staff will be educated on the safe and efficient operation and maintenance requirements of the installed item | Ensure building/property management team and operations staff is informed of the safe, efficient operation and maintenance requirements of the installed item |