FavoritePlease sign in to add this to your favorites. Topic: Forced Air Subtopic: System Assessment and Maintenance Desired Outcome: Cooling tower evaluated and maintained as needed Multifamily HomesPrintCopy to ExcelEmail TitleSpecification(s)Objective(s) 5.3003.31a Submetering Submeters will be installed on the supply and bleed lines of the cooling towerSubmeters installed on the bleed line will be suitable to deal with solids Ensure efficient system operationReduce water consumption 5.3003.31b Water treatment Cooling tower water will be treated to prevent buildup of scale and algae Ensure system durabilityEnsure system operates efficiently Previous Detail Next Detail Back to 5.3003 System Assessment and Maintenance Back to Top