5.3003.28a
Sizing Compressor will be properly sized for the existing equipment and evaluated in accordance with
ANSI
ANSI
American National Standards Institute, www.ansi.org
/
ACCA
ACCA
Air Conditioning Contractors of America, www.acca.org
Standard 5
Ensure equipment operates as designed
Ensure equipment operates safely
Ensure equipment operates efficiently
Ensure equipment is durable
5.3003.28b
Location Compressor will be located in an area that is on a level surface and that provides adequate ventilation
Ensure equipment operates as designed
Ensure proper lubrication of moving parts
Ensure equipment operates efficiently
Ensure equipment is durable
5.3003.28c
Refrigerant piping Suction line will be properly sized
Refrigeration tubing will be used
Inert gas will be trickled through piping when brazing joints together
Filter dryer will be installed
P-type oil traps will be located at the base of suction line riser
Proper evacuation and dehydration procedures will be followed
Horizontal runs will be sloped 1" per 20' toward the compressor
Vibration absorbers may be used and installed in accordance with manufacturer specifications
Ensure adequate velocities for proper oil return
Ensure that the piping is installed in a manner that does not interfere with normal maintenance or service procedures
Ensure contaminants do not enter the system
Ensure proper operation
Ensure equipment operates efficiently
Ensure equipment is durable
5.3003.28d
Electrical Field wiring will be installed in accordance with
NFPA
NFPA
National Fire Protection Association, www.nfpa.org
70 National Electric Code and local codes
Proper voltage, frequency, and phase will coincide with the nameplate
Ensure equipment operates as designed
Ensure equipment operates safely
Ensure equipment operates efficiently
Ensure equipment is durable
5.3003.28e
Startup All electrical connections will be tight
All safety controls will be installed and operational
Oil level will meet manufacturer-recommended level
Only approved refrigerant oil will be used
Proper refrigerant charge will be verified by approved methods
Refrigerant type and amount will be documented
Ensure equipment operates as designed
Ensure equipment operates safely
Ensure equipment operates efficiently
Ensure equipment is durable
5.3003.28f
Maintenance Maintenance will be scheduled in accordance with
ANSI
ANSI
American National Standards Institute, www.ansi.org
/
ACCA
ACCA
Air Conditioning Contractors of America, www.acca.org
/
ASHRAE
ASHRAE
American Society of Heating, Refrigerating and Air-Conditioning Engineers, www.ashrae.org
Standard 180; Standard Practice for Inspection and Maintenance of Commercial Building
HVAC
HVAC
Heating, ventilation, and air conditioning
Systems or
ANSI
ANSI
American National Standards Institute, www.ansi.org
/
ACCA
ACCA
Air Conditioning Contractors of America, www.acca.org
Standard 4 Maintenance of Residential
HVAC
HVAC
Heating, ventilation, and air conditioning
Systems
Maintenance procedures include, but are not limited to, the following:
Refrigerant charge will be evaluated, and refrigerant will be added or removed as necessary (a lack of refrigerant may indicate a leak, which will need to be corrected) Oil level will be evaluated, and oil will be added or removed as necessary Filter dryer moisture indicator and pressure drop across the filter will be evaluated Filter dryer will be replaced as necessary Amperage draw will be evaluated and compared to the compressor nameplate Ensure equipment operates as designed
Ensure equipment operates safely
Ensure equipment operates efficiently
Ensure equipment is durable