4.1303.3a
R-value Insulation will be installed in accordance with recommended R-value
Insulate to prescribed R-value for the climate zone
4.1303.3b
Work assessment Ensure complete accessibility of floor cavity
Ensure work area is clean, safe, and ready to accept insulation
4.1303.3c
Preparation All floor areas will be open and accessible for spray foam application
Any openings in the subfloor larger than ¼" will be covered with appropriate materials
Insulation dams or end blockers will be installed where needed
All surfaces where spray foam is applied will be clean, dry, and free of contamination and degradation
Substrate surfaces will be wiped, blown, or vacuumed to be free of excessive dust and dirt
Grease and oil will be removed using appropriate cleaners or solvents
Moisture content of all wood substrate materials will be below 19%; if tested at or above this percent of moisture, insulating the floor will be deferred until moisture level is corrected
Clean floor cavities
Remove all remnants of previous insulation and bottom board
Prepare all substrate surfaces for the application of spray foam
4.1303.3d
Installation Insulation will be installed to prescribed R-value in accordance with manufacturer specifications
In accordance with manufacturer specifications, spray foam will be applied to desired thickness using the maximum pass thickness onto subfloor between floor joists and all rim/band joists
Rim/band joist will be sealed
When desired, underside of joists will be covered with spray foam to provide a layer of continuous insulation
Each cavity will be insulated to specified R-value
Insulation must be in contact with subfloor
Insulation will not have gaps or voids
Ducts and water lines will be insulated for climate conditions
Insulate and seal floors
Eliminate voids
Minimize conductive and convective heat transfer across the floor system
Ensure durability
4.1303.3e
Materials Insulation will be installed in accordance with manufacturer specifications
Flame spread index of selected materials will not exceed 25 with an accompanying smoke-developed index not to exceed 450 when tested in accordance with
ASTM
ASTM
ASTM International, www.astm.org
E 84 or
UL
UL
Underwriters Laboratories
723
Flame spread index of foam insulation will not exceed 75 and a smoke- developed index of no more than 450 when tested in the maximum thickness intended for use in accordance with
ASTM
ASTM
ASTM International, www.astm.org
E 84 or
UL
UL
Underwriters Laboratories
723
Foam insulation will be separated from the interior of the building by an approved thermal barrier at minimum 1/2" gypsum or a material that is tested in accordance with the acceptance criteria of both the Temperature Transmission Fire Test and the Integrity Fire Test of
NFPA
NFPA
National Fire Protection Association, www.nfpa.org
275
Ensure durability
Ensure worker safety
Ensure proper installation
Fire safety will be maintained
4.1303.3f
Fire protection Spray foam will be separated from the occupied space of the building with a 15-minute thermal barrier (typically 15/32" sheathing, 1/2" gypsum board, or approved thermal barrier coating) or as approved by
ASTM
ASTM
ASTM International, www.astm.org
E84 requirements
Spray foam designed to be used as a fire block does not require a thermal barrier installed prior to application
Provide necessary fire protection for combustible spray foam insulation
4.1303.3g
Occupant education A dated receipt signed by the installer will be provided that includes:
Coverage area
Thickness
R-value Document job completion to contract specifications
Confirm amount of insulation installed
Comply with 16 CFR 460.17