FavoritePlease sign in to add this to your favorites. Topic: Floors Subtopic: Manufactured Housing Belly Preparation Desired Outcome: Belly floor cavity ready for insulation Manufactured HousingPrintCopy to ExcelEmail TitleSpecification(s)Objective(s) 4.1302.1a Work assessment Gas, water, waste, and electrical lines will be checked for: Plumbing leaks Gas/oil leaks Attachment Standing water Raw sewage Pests Ensure that floor space is safe and ready for workVerify scope of work 4.1302.1b Preparation Where bottom board/rodent barrier is missing or damaged and accessible, the following will be ensured: Duct sealing completed Gas, water, and electrical lines secured at least every 4' to a floor joist or framing member Water line will be located on the warm side of the insulation; if not, the water lines will be insulated appropriately No water or gas leaks are present Waste lines are sloped to ¼" per foot Bottom board/rodent barrier is sound/strong enough to support insulationWhen bottom board is intact, the following will be ensured: Holes and penetrations in the bottom board and decking sealed Duct sealing completed No water or gas leaks present Bottom board is sound/strong enough to support insulation Water lines are secured to the floor joists/warm side of the insulation; if not, the water lines will be insulated appropriatelyProblems will be corrected before floor cavity insulation work begins Ensure problems are corrected before floor cavity insulation work beginsKeep pipes from freezing Back to 4.1302 Manufactured Housing Belly Preparation Back to Top