4.1104.3a
Access wall cavities With T-111, OSB, or plywood type siding:
Access to exterior wall cavities will be gained and sheathing will be drilled as needed and probed to locate each cavity, wall studs, and blockers Drilled holes will be large enough to accommodate an appropriately sized fill tube Holes will be drilled around the perimeter of the home, parallel to the bottom plate and an equal distance apart The line of holes will be located under the lowest window sill when possible With lap siding:
Course of siding will be unhooked or removed Holes sufficiently large for the fill tube will be drilled in every wall cavity Gain access to the wall cavity
Ensure holes are easily covered with an aesthetically pleasing trim strip
4.1104.3b
Exterior wall cavity inspection Installer prework assessment will be conducted to determine:
Moisture damage Presence of infestation or pests Location and integrity of wiring Holes to the interior and exterior Loose paneling or siding Location of belt rails Location of wall obstructions (switches, outlets) Existing insulation Wall hangings for removal during work Problems will be corrected before work begins
Prepare wall cavity for insulation
Prevent water leaks
4.1104.3c
Blowing machine set up Blowing machine pressure test will be performed with air on full, feed off, and gate closed
Hose outlet pressure will be set in accordance with manufacturer specifications
Ensure machine is capable of delivering uniform insulation density and coverage
4.1104.3d
Fiberglass blown insulation installation Flame spread and smoke-developed index for insulation will meet a flame spread rating of 25 or less and a smoke development rating of 450 or less when tested in accordance with
ASTM
ASTM
ASTM International, www.astm.org
E84
Insulation will be installed to a density of 1.5 to 1.6 pounds per cubic foot
Using fill tube, 100% of each cavity will be filled to a consistent density
Fill tube will be inserted within 6" of the top of the cavity between the interior paneling and any existing insulation
Fill entire wall cavity to the prescribed R-value to reduce air
infiltration
Infiltration
The uncontrolled passage of outside air into a building through unintended leaks in the building envelope
Avoid clogging of the cavity and the fill tube
Fire safety will be maintained
4.1104.3e
Plug and seal holes Holes will be plugged and sealed
Ensure the integrity of the drainage plane
4.1104.3f
Final wall assembly For T-111 and equivalent siding:
A preprimed trim will be centered and installed over the holes Height of the trim will span from 1" above to 1" below the hole A continuous caulk seal will be applied between the trim and siding Caulk seal will be above the holes Top edge of the trim will be sealed to the siding with a continuous caulk seal For lap siding:
Siding will be reattached without bulges or wrinkles Siding will be hooked into the original position Ensure the integrity of the drainage plane
Return siding to existing conditions without damage
4.1104.3g
Onsite documentation A dated receipt signed by the installer will be provided that includes:
Coverage area
Thickness
R-value Document job completion to contract specifications
Confirm amount of insulation installed
Comply with 16 CFR 460.17