4.1103.5a
Worker safety All worker safety specifications will be in accordance with SWS 2.0100.3 Worker Safety
Ensure worker safety, especially in regard to fall protection considerations and contaminants found in demolition, such as asbestos, lead, polychlorinated biphenyls, etc
4.1103.5b
Occupant safety Occupant will be notified of changes or repairs to be made
An occupant safety plan will be prepared and implemented
Ensure occupant safety
4.1103.5c
Pre-inspection Conduct pre-inspection in accordance with SWS 2.0100.4 Work Area Inspection and Stabilization
Repairs necessary to stabilize work areas and protect or preserve integrity of energy improvement will be completed before subject work begins
Insulation will not be installed if moisture-related issues are not resolved
Existing water control measures will be identified
Air sealing locations will be identified on the exterior walls
Air sealing will be completed before installing insulation unless an alternative
air barrier
Air barrier
The separation between the interior and exterior environments of a building that slows air flow to the point that no smoke movement is visible at 50 pascals of pressure difference across the boundary
system will be applied
For structures covered by the International Building Code (
IBC
IBC
International Building Code
), all exterior walls to be insulated will be assessed for provision of a
thermal boundary
Thermal boundary
The separation between the interior and exterior environments of a building that slows heat flow
(fire stopping) when foam insulating materials are to be used (
IBC
IBC
International Building Code
2603.4)
Ensure that improvements will not compromise building system integrity
Ensure a durable, continuous air and
thermal boundary
Thermal boundary
The separation between the interior and exterior environments of a building that slows heat flow
Avoid compromising water control system
Ensure that insulation retrofit complies with applicable code regarding fire separation
4.1103.5d
Prepare substrate Exterior siding will be removed as appropriate
Where siding materials contain lead, lead-safe work practices will be used
Where siding contains asbestos, relevant codes regarding its removal and reinstallation will be determined and followed
Insulation will not be installed until mold, water leaks, water damage, and pest issues are resolved
Repairs necessary to stabilize work areas and protect or preserve integrity of energy improvement will be completed before subject work begins
Maintain a safe work environment for workers and occupants
Comply with applicable laws, regulations, and codes with regard to hazardous materials
Ensure there is a solid substrate to apply
air barrier
Air barrier
The separation between the interior and exterior environments of a building that slows air flow to the point that no smoke movement is visible at 50 pascals of pressure difference across the boundary
and insulation
4.1103.5e
Sealant selection Sealants will be compatible with their intended surfaces and applied in accordance with manufacturer specifications
Selection will be durable, pest resistant, and have a weather-appropriate seal
Indoor sealants will be low volatile organic compound (
VOC
VOC
Volatile organic compound
) products that meet independent testing and verification protocols, such as Green Seal GS-36, "GREENGUARD Children and Schools," or comparable certifications
Fire-resistance-rated assemblies will be provided with sealants permitted by the authority having jurisdiction and adopted building code
Prevent intrusion of moisture and pests into the sealed assembly
Prevent exposing workers or occupants to excessive
VOC
VOC
Volatile organic compound
levels
Ensure sealant meets or exceeds the performance characteristics of the assembly and is compliant with local fire code requirements
4.1103.5f
Installation Insulation will be installed to provide a continuous thermal (insulation) barrier to achieve the specified R-value for the assembly being insulated. Where the insulation material does not provide an
air barrier
Air barrier
The separation between the interior and exterior environments of a building that slows air flow to the point that no smoke movement is visible at 50 pascals of pressure difference across the boundary
as installed, such air sealing as required to create a continuous
air barrier
Air barrier
The separation between the interior and exterior environments of a building that slows air flow to the point that no smoke movement is visible at 50 pascals of pressure difference across the boundary
in direct contact with thermal (insulation) barrier will be incorporated into the work scope
Water management system will be continuous to protect the building
Air and thermal boundaries will be integrated with other building systems
Ensure a durable, continuous air and
thermal boundary
Thermal boundary
The separation between the interior and exterior environments of a building that slows heat flow
4.1103.5g
Onsite documentation A dated receipt signed by the installer will be provided that includes:
Insulation type
Coverage area
R-value
Installed thickness and settled thickness (settled thickness required for loose-fill only)
Number of bags installed in accordance with manufacturer specifications (for loose-fill only) Document job completion to contract specifications
Confirm amount of insulation installed
Comply with 16 CFR 460.17