| 4.1003.13a
Installation | Insulation will be installed to prescribed R-value in accordance with manufacturer specifications Spray polyurethane foam (
SPF
SPF
Spray polyurethane foam
) will be applied to desired thickness onto roof sheathing between rafters or trusses, using pass thickness maximum as indicated by manufacturer When desired, underside of rafters or trusses will be covered with
SPF
SPF
Spray polyurethane foam
to provide layer of continuous insulation Where rigid foam plastics are used, in no case will the final thickness exceed the manufacturer's tested thickness used to determine the maximum 75 flame spread and 450 smoke-developed index when tested to
ASTM
ASTM
ASTM International, www.astm.org
E84 or
UL
UL
Underwriters Laboratories
723 Foam will be provided with ignition and thermal boundaries, as required by code Unneeded attic ventilation openings will be covered with a substrate and then covered with
SPF
SPF
Spray polyurethane foam
In colder climates (
IECC
IECC
International Energy Conservation Code
Zones 5-8)
SPF
SPF
Spray polyurethane foam
will be installed to a thickness of least class II
vapor retarder
Vapor retarder
A material that slows the passage of water vapor and contains a perm rating above 1
or have at least class II
vapor retarder
Vapor retarder
A material that slows the passage of water vapor and contains a perm rating above 1
coating or covering in direct contact with the underside of the
SPF
SPF
Spray polyurethane foam
| Ensure complete and consistent coverage throughout roof plane Eliminate cracks, gaps, and voids Minimize framing cavity air flow Minimize moisture migration and unwanted condensation in insulation (vapor retarders) Ensure alignment of insulation and
air barrier
Air barrier
The separation between the interior and exterior environments of a building that slows air flow to the point that no smoke movement is visible at 50 pascals of pressure difference across the boundary
|
| 4.1003.13b
Onsite documentation | A dated receipt signed by the installer will be provided that includes: Coverage areaThicknessR-value | Document job completion to contract specifications Confirm amount of insulation installed Comply with 16 CFR 460.17 |
| 4.1003.13c
Building operations staff education | Documentation of material and R-value will be provided to building operations staff | Provide occupant with documentation of installation |