4.1005.1a
Preparation Subfloor or drywall will be removed to access cavities as necessary, including inaccessible knee-wall attic floor spaces
All electrical junctions will be flagged to be seen above the level of the insulation
Open electrical junction boxes will have covers installed
Access the workspace
Provide location of electrical junctions for future servicing
Prevent an electrical hazard
4.1005.1b
Installation Batt insulation will be installed in accordance with manufacturer specifications without gaps, voids, compressions, misalignments, or wind intrusions
Insulation will be installed to the prescribed R-value
Insulate to prescribed R-value
4.1005.1c
Occupant education A dated receipt signed by the installer will be provided that includes:
Coverage area
Thickness
R-value Document job completion to contract specifications
Confirm amount of insulation installed
Comply with 16 CFR 460.17